Fully Integrated Fabrication Workshop
Aswar owns a complete fabrication workshop, making it self-sufficient without relying on outside workshops.
8 welding machines
13 angle grinders
8 bolting drill presses
5 fixed cut-off saws
Documented Site Equipment & Machinery
| # | Machine / Equipment | Quantity | Notes |
|---|---|---|---|
| 1 | Complete timber formwork | 600 m² | New plywood |
| 2 | Surveying instruments | Auto level + digital theodolite | — |
| 3 | Tower scaffolding | 80 complete towers | — |
| 4 | Suspended Marina scaffold | 1 | Suspended scaffold |
| 5 | Material hoist | 2 hoists | In good working order |
| 6 | 10 kVA generator | 4 generators | Jiandong, silenced |
| 7 | Concrete power float | 1 | — |
| 8 | Mechanical concrete vibrator | 3 vibrators | — |
| 9 | Hydraulic plate compactor | 900 kg | — |
| 10 | Water tanker, 27-barrel capacity | 1 tanker + water bowser | — |
| 11 | Complete camp tents | 3 tents | — |
Steel & Shed Fabrication Workshop
Aswar relies on a fully equipped steel workshop that fabricates shed sections in-house. The workshop is equipped with: 8 welding machines, 13 angle grinders, 8 bolting drill presses, a punching drill up to 22 mm, and 5 fixed cut-off saws.